Blog
Our blog has our latest thinking on customized water and wastewater management solutions.
We post new material regularly, so check back often.
Temporary Pipeline Construction Projects: It’s Time to Winterize
November 13, 2024
Temporary Pipeline Construction Projects: It’s Time to Winterize In some parts of Pennsylvania, West Virginia, and Ohio temperatures are dipping into near-freezing at night, especially at higher elevations. Winter will be here before long. With temporary pipeline construction projects, anytime there is potential for temperatures to fall below 32oF it’s time to winterize. Waiting until...
Read MoreA Water Transfer Automation Success Story: High-Tech Monitoring, No Spills or Overflows, One Employee
August 05, 2024
Historically, unconventional oil and gas extraction has relied on a large workforce and a fleet of trucks to transfer produced water from individual pad site to storage, disposal, or the next frac. While effective, it has drawbacks – inefficiency, high labor costs, and risk to worker safety and to the environment from spills or overflows....
Read MoreEnsuring Best-in-Class Water Transfer Services through Training
July 22, 2024
Training has always been integral to Keystone Clearwater Solutions providing best-in-class water transfer services for the oil and gas industry. With employment growing—the number of people employed in hydraulic fracturing services in the US increased 2.9% on average over the five years between 2018 and 2023—the need for comprehensive training is vital for safety and...
Read More